West of England railway line set for two week closure

Picture of Roger Smith

Share:

West of England railway line set for two week closure

Share:

Picture of Roger Smith

Share:

West of England line at Honiton Tunnel. // Credit: Network Rail
West of England line at Honiton Tunnel. // Credit: Network Rail

For two weeks in November, there will be no train services on the West of England line between Axminster and while engineers install one mile of new track through Honiton Tunnel.

The work will take place from Saturday, 9th to Friday, 22nd November inclusive, and during that time a rail-replacement bus service will operate between Axminster and .

Closure warning for the Axminster to Exeter line. // Credit: Network Rail
Closure warning for the Axminster to Exeter line. // Credit: Network Rail

While the line is closed, engineers will replace the existing 50-year-old track through the tunnel and install new sleepers and ballast.

The new track has a protective coating to resist corrosion and prolong its life.

Improvements will also be made to the track drainage, which channels water away from the tunnel to reduce the likelihood of because of flooding.

Work on the West of England line. // Credit: Network Rail

Network Rail will also take advantage of the closure to carry out other work on the line, including:

  • Maintenance work at level crossing and Fenny Bridges foot crossing.
  • Clearing diseased and dangerous trees between Honiton and Pinhoe.
  • Replacing half a mile of track between Pinhoe and Feniton.
The Axminster to Exeter line. // Credit: Network Rail
The Axminster to Exeter line. // Credit: Network Rail

In 2022, the line was closed for five days while Network Rail carried out landslip prevention work at the entrance to Honiton Tunnel, and last year the line between Axminster and Salisbury was closed for 21 days for further upgrade work.

“There is never a convenient time to close the railway for an extended duration so we re sorry to any passengers disrupted by this closure and thank them in advance for their patience and understanding.

Mark Goodall, Wessex Route Director

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles