Transport for Wales make progress with the construction of South Wales Metro

Picture of Chloe White

Share:

Transport for Wales make progress with the construction of South Wales Metro

Share:

Picture of Chloe White

Share:

South Wales Metro construction work
South Wales Metro construction work. // Credit: Transport for Wales

Construction work on the South Metro was undertaken through the festive period started on eve and saw teams working around the clock until the early hours of the 7th of January 2022 with a railway closure between and both Merthyr Tydfil and .

The blockade has provided Transport for Wales (TfW) and their partners the opportunity to carry out the essential work on key infrastructure such as the removal of Devil’s Footbridge, the installation of over 63,000 metres of fibre-optic cable which is part of the upgrading of signalling equipment and more than 100 trial holes and a mixture of foundations completed in preparation for the electrification of the line.

Work during the Christmas blockade
Credit: TfW

The project that will transform the Core Valley Lines for the South Wales Metro has been partially funded by the European Regional Development Fund via Welsh Government and will bring more frequent services between and the heads of the valleys.

Teams working on the ground have also overseen the successful installation of 150 metres of track which includes five switching and crossing panels.

The Christmas Blockade for work on South Wales Metro
Credit: TfW

Karl Gilmore, Rail Infrastructure Director at TfW said:

“We safely and successfully completed another blockade on the Core Valley Lines, which means another forward step in delivering the South Wales Metro for the people of Wales.

“We were able to deliver key infrastructure works that will allow us to electrify the line and prepare it for the introduction of brand-new tram-trains in the coming years.
“Our teams and partners worked continuously over the Christmas break to minimise disruption to the travelling public.

“I’d like to thank our teams and partners for their dedication and hard work in testing weather conditions and also to the travelling public and our lineside neighbours for their understanding and continued support.

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

  1. Like the way the TfW Infrastructure director states ‘delivering the South Wales Metro for the people of Wales’ . Surely it should say – for the people of South Wales? Just more evidence that the Welsh government is all about South Wales.

Related Articles