The Bluebell Railway Atlantic Group have published their July 2021 update on the building London, Brighton and South Coast Railway (LBSCR) H2 class No.32424 “Beachy Head”.
Over the past two months, many components have been sponsored, helping to drive progress forward. Many smaller parts have been produced in house, with these now awaiting fitting.
Boiler Cladding
One of the many new parts the group need to make is the boiler cladding. The team are currently working on manufacturing each panel, a task which can be difficult and slow to ensure each panel fits correctly.
Some panels have been produced by a contractor following drawings provided, but with many sections needing cutouts for washout plugs, handrails etc, the group have most panels ordered without any cutouts and are slightly larger so they can be cut down to fit.
Some sections have been cut with a grinder, allowing them to bent into space, with the cuts to be welded up afterwards.
Tender
The tender is roughly 95% complete mechanically, with testing and final checks needed before fit for service. Undercoats are being painted on, with topcoats and gloss to follow at a later date.
For more information or to support the Bluebell Railway Atlantic Group, please click here.
Where Next?
RAILADVENT NEWS
The latest railway news
RailAdvent Plus
Discounts, videos, pictures and more!
FREE NEWSLETTERS
Signup to our daily and weekly newsletters
RAILADVENT SHOP
Railway Prints, DVD’s / Blu-Ray’s, books and more
LOCOSTOP COMMUNITY
Come and share your railway pictures
UK STEAM INFO
Upcoming mainline steam tours/loco movements
Bluebell Railway
Visit their website
Responses