Coupled wheel springs replaced on A1 steam locomotive No. 60163 “Tornado”

Picture of Jamie Duggan

Share:

Coupled wheel springs replaced on A1 steam locomotive No. 60163 “Tornado”

Share:

Picture of Jamie Duggan

Share:

Tornado at the National Railway Museum
Credit: A1 Steam Locomotive Trust

In the process of preparing their new build London and North Eastern Railway (LNER) Peppercorn A1 Class No.60163 “Tornado” for mainline running later this year, the have undertaken some maintenance work to ensure smooth running for the next 12 months.

Although scheduled to operate mainline trains later on this year, “Tornado” is currently stored at the National Railway Museum (NRM) in York until tours can go ahead.

The Trust has been using this time to inspect the engine and note down any maintenance or replacements work to be done.

Back in August / September 2020 one coupled wheel spring had broken and was replaced, with the decision now made to replace the other five.

This should hopefully mean when 60163 returns to the track the locomotive can run with reduced chances of developing a fault.

Five Brand New Springs // Credit A1 Steam Locomotive Trust
Five Brand New Springs // Credit A1 Steam Locomotive Trust

The work was carried out at NRM York using their onsite facilities. The process for the work was:

  1. Using lifting equipment the five new springs were lowered into the Inspection Pit
  2. To create space to work under the engine, the team had to disassemble the Brake Gear Pull Rods
  3. Lifting the locomotive with hydraulic jacks to ease the pressure off the springs
  4. Removing nuts holding the spring boxes in place
  5. Removal of the spring boxes took longer than anticipated – more dismantling work and different approach to removal had to be tried
  6. Old springs removed – showing the worn condition
  7. Fit new springs onto the engine
  8. With the assistance of a North Yorkshire Moors Railway (NYMR) Fitter and weighing equipment, “Tornado” had the suspension and springs set on its Leading Bogie, Coupled Wheelsets and Trailing Truck.
    These tasks took time to ensure each axle was carrying the correct weights as specified in the specification.
Underside of 60163 // Credit A1 Steam Locomotive Trust
The underside of 60163 // Credit A1 Steam Locomotive Trust

All work has now been completed, with 60163 now awaiting for resuming of mainline work.

Where Next?

RAILADVENT NEWS
The latest railway news
FREE NEWSLETTERS
Signup to our daily and weekly newsletters
RAILADVENT SHOP
Railway Prints, DVD’s / Blu-Ray’s, books and more
LOCOSTOP COMMUNITY
Come and share your railway pictures
UK STEAM INFO
Upcoming mainline steam tours/loco movements
A1 Steam Loco Trust
Visit their website

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles