Replacement of Norfolk railway bridge gets underway

Picture of Alan Holden

Share:

Replacement of Norfolk railway bridge gets underway

Share:

Picture of Alan Holden

Share:

Eccles Heath Bridge replacement
Credit: Network Rail

Work is underway to replace a bridge at Eccles Heath on the to railway line after a road traffic incident damaged it.

The bridge was closed in November 2017 after it was damaged and after exploring different options it was decided that the bridge needed replacing.

Work was originally planned for the replacement to be built in 2022, but this has been brought forward due to the impact of the road closure.

The new bridge at Eccles Health, between Attleborough and Snetterton, will have new parapets along with a new bridge deck.

The bridge carries the road over the busy Norwich to Thetford rail line between and Eccles Road stations and was damaged beyond repair in the incident.

Eccles Heath Bridge Replacement
Credit: Network Rail

Preparatory works along with the setup of the working site are underway at the bridge which is between Harling Road and Eccles Road railway station.

The main work begins at the end of this month until the 18th of December.

A rail replacement bus service will be in operation for 2 weekends to enable work to be carried out.

Saturday 31 October – Sunday 1 November

Rail replacement in operation between Norwich and / Norwich and

Saturday 7 – Sunday 8 November

Rail replacement in operation between Norwich and Thetford

Ellie Burrows, Network Rail’s route director for Anglia, said: “When incidents like this occur, we always try to make a repair and reopen the road as soon as we can. On this occasion, the damage was so extensive that a replacement is the only way forward to maintain safety for everyone. We understand the importance of getting this done quickly, and I’d like to thank our railway neighbours and our passengers in advance for their patience while we carry out this work.”

Jamie Burles, Greater Anglia Managing Director, said: “It’s good news that these important repairs are brought forward. We will be running a rail replacement bus service while Network Rail work to repair the bridge. Passengers should check before they travel, allow more time for their journey and wear a face covering when travelling by train or rail replacement bus.

“We would like to thank customers for their patience and understanding while this work takes place.”

Where Next?

RailAdvent Plus
Get image downloads, Prints and Streaming Video
RailAdvent News
The latest railway news
RailAdvent Shop
Railway Prints, DVD’s / Blu-Ray’s and more
LocoStop Community
Come and share your railway pictures
Mainline UK Steam Info
Upcoming mainline steam tours/loco movements
Network Rail
Visit their website

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles