April has been another busy month for the Stanier Mogul Fund, with 13245 looking more like an engine each month.

Cab and Firebox

The handrails have been welded back onto cab side sheets. The weld now needs grounding smooth before the area can be painted.

The new wooden cab floor is starting to be laid, and fitting of the new fall plates is in progress.

The right-hand fall plate is attached, with the left-hand one undergoing final work before its ready. New black paint now covers the reverser.

Lining up Handrail for Welding // Credit SMF
Lining up Handrail for Welding // Credit SMF

Now repairs to the outer throatplate have been completed, stays are now being refitted to the inner throat plate.

The new lower backplate is due to be welded in place soon. The join line between the new plate and existing backplate has been cleaned ready.

Cylinders and Pipes

The newly bored cylinders are now ready to receive their new liners, due to be fitted soon. Aligning equipment has been set up ready for fitting the liners.

Hidden under the running plate, various pipes such as the steam heating pipe, are fixed to the frame. Many of these pipes are now being refitted to the engine.

Pipes and Valve Gearing Parts // Credit SMF
Pipes and Valve Gearing Parts // Credit SMF

Where Next?

News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Framed Prints, DVD’s / Blu-Ray’s and more
LocoStop Community
   Come and share your railway pictures
Stanier Mogul Fund
   Visit their website

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles