Progress on 6880 Betton Grange – January 2018

Picture of Jamie Duggan

Share:

Progress on 6880 Betton Grange – January 2018

Share:

Picture of Jamie Duggan

Share:

Firebox of 6880 "Betton Grange" with Metal Removed // Credit Betton Grange Society
Firebox of 6880 "Betton Grange" with Metal Removed // Credit Betton Grange Society

Overhaul work on 6880 ‘Betton Grange and its Boiler at Tyseley Locomotive Works is progressing well.

6880 Betton Grange is the 81st Grange and its build is taking place at Tyseley.

Removal of the Front Taper Section of the Boiler has been done. Metal forming the Outer Firebox that needs replacing has been cut out and removed.

This now can allow for the new sections to be fitted to the Firebox.

New Parts

New parts for the Boiler have also been delivered to Tyseley. These are the Smokebox and Ashpan, both brand new.

Both have been delivered as a Kit of Parts, and will need to be assembled before they can be fitted to 6880’s Boiler.

Smokebox Parts for 6880 "Betton Grange" // Credit Betton Grange Society
Smokebox Parts for 6880 “Betton Grange” // Credit Betton Grange Society

 

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles