Bedfordshire trains set for Sunday disruption

Picture of Roger Smith

Share:

Bedfordshire trains set for Sunday disruption

Share:

Picture of Roger Smith

Share:

Engineers installing overhead lines as part of the Midland Mainline Upgrade. // Credit: Network Rail
Engineers installing overhead lines as part of the Midland Mainline Upgrade. // Credit: Network Rail

Major engineering work between Kettering and Wigston, and Bedford and will cause severe disruption on Sundays for the next month to services by East Midlands Railway (EMR), and Govia Railway (GTR).

The work is being carried out as part of the upgrading of the Midland Main Line on Sundays 21 April and 5, 12, and 19 May.

Whilst the work is in progress, rail-replacement bus services will be provided from 00.05 to 08.05.

Between Kettering and Wigston, new overhead wires are being installed, and between Bedford and Luton, the existing overhead line equipment will be upgraded.

Network Rail engineers carrying out maintenance work on the overhead lines at Shenstone station
Network Rail engineers carrying out maintenance work on overhead lines. // Credit: Network Rail

Once the work is completed, East Midland Railway trains will be able to run at 125 mph, resulting in faster, journeys between the East Midlands and London.

Maintenance work to improve reliability will take place this Saturday, 20 and Sunday, 21 April on Thameslink lines through central London, which means there will be no Thameslink services between and or Sutton/Wimbledon.

Overhead wires being installed. // Credit: Network Rail
Overhead wires being installed. // Credit: Network Rail

On Sunday, 21 April

  • Buses will replace Thameslink trains between and St Pancras International.
  • Thameslink services will not call at Kentish Town all that day.

Saturday, 18 and Sunday, 19 May

  • A reduced train service will operate between Sheffield / Nottingham and London St Pancras with a diversion between Kettering and Wigston.
  • Rail replacement bus services will operate between Leicester, Market Harborough, and Kettering.
  • A reduced train service will operate between Radlett and Cricklewood because Network Rail will be installing new switches and crossings.
Kettering canopies - after
Kettering station. // Credit: Network Rail

Work to deliver major upgrades to the Midland Main Line is ramping up and our engineers will be working hard throughout weekends in April and May to deliver these improvements.

We always try to minimise disruption to passengers when carrying out work which is why we are working overnight to upgrade existing overhead line equipment, but some work needs an extended period to be completed.

Passengers should check their journey before travelling so that they are up to date with the latest information. We want to thank them for their understanding and patience as this work is carried out

Gavin Crook, Principal Programme Sponsor for Network Rail’s East Midlands route

We are strongly advising customers planning to travel throughout April and May to check their journeys in advance by looking for updates on the EMR website.

Engineering work will affect EMR services and customers should expect extended journey times with rail replacement buses and amended timetables in place.

We would like to thank our customers for their patience whilst the engineering work to electrify the Midland Main Line takes place. This work will greatly benefit our customers in the future with more reliable, quicker journeys to and from London.

Dave Meredith, East Midlands Railway Customer Services Director

We thank our customers for their patience and understanding while Network Rail are modernising the infrastructure on this important route. Please plan ahead, and double-check your route before you set off, allowing plenty of extra time if you need to use replacement buses or other alternatives.

Jenny Saunders, Thameslink and Great Northern Customer Services Director

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles