A June update on steam locomotive No.42968

Picture of Michael Holden

Share:

A June update on steam locomotive No.42968

Share:

Picture of Michael Holden

Share:

42968
Credit: Stanier Mogul Fund

The Stanier Mogul Fund has released their latest update on their overhaul of steam locomotive No.42968.

Frames

Repairs to the frame are now complete. The first coats of primer paint have also been applied. Work can now begin to replace the components which have been removed in order to allow the coats of primer to be applied.

Running plate

The section of the running plate above the repair work had to be taken out by the volunteers. This is now being replaced with new steel, this is because the original holes had worn down to an oval shape

 

Cab
Credit: Stanier Mogul Fund

The cab side on the left-hand side of the locomotive has been positioned temporarily. This is to allow alignment checks to be made and also to allow mounting holes to be drilled in the new supporting steelwork behind. Similarly, the rear panel has been replaced with the holes it, this will support the rear of the cab’s floorboards and tender fall plate.

Additionally, the rear stanchion has been trial fitted. The job of this is to support the cab side sheet and holds the door to the tender, though this wasn’t fitted this time.

The cab footsteps are now ready for painting and fitting, though they cant be fitted yet as the jack beam is in its way.

Frames

The swivel pin for the pony truck is now bolted back into place and is now awaiting the riveters to come.

The sidebars are now marked up and await fitting.

Wheels

The wheels have now returned from the South Devon Railway and have now begun transferring back into black.

Credit: Stanier Mogul Fund

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles