Part of Manchester Metrolink set to close for upgrade work

Picture of Michael Holden

Share:

Part of Manchester Metrolink set to close for upgrade work

Share:

Picture of Michael Holden

Share:

Tram and bus near Shudehill.
Tram and bus near Shudehill. // Credit: TfGM

Part of the in the City Centre is set to close later this month to allow for upgrade work to take place.

No trams will operate between the 24th July and 19th August on the line between Market Street and Shudehill whilst the work takes place.

Passengers travelling between Piccadilly and Victoria can use a replacement bus service or change trams at St Peter’s Square.

Shudehill will also close to traffic where trams cross the road between the 24th July and 5th August.

A diversion route will be signposted for both cyclists and drivers. However, says that access to the Arndale will be maintained at all times.

Please check with Transport for Greater Manchester for the latest travel advice.

“Thousands of journeys are made on every day of the week, which is why we’re always working to keep our passengers safe and moving.   

“During these essential works, we will be doing everything we can to keep disruption to a minimum with replacement bus services and signed diversions for vehicles and pedestrians.   
   
“I would encourage customers to plan ahead – check our website for the latest travel information before setting off – and leave plenty of time for their journeys.    

Pete Sommers, TfGM’s Metrolink Director

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles