Riley & Sons to carry out work on steam locomotive No. 8572

Picture of Michael Holden

Share:

Riley & Sons to carry out work on steam locomotive No. 8572

Share:

Picture of Michael Holden

Share:

B12 8572 at Weybourne MPD
B12 8572 at Weybourne MPD // Credit: M&GN Society

The Midland & Great Northern Joint Railway Society has announced that will carry out work on LNER B12 No. 8572.

The Heywood based contractor has signed a deal with the society to overhaul the engine chassis and tender.

8572’s chassis is currently outside Weybourne MPD under tarpaulin awaiting a move to Heywood, Lancashire. The move is expected to happen in late February / early March once space in the workshop becomes available.

The chassis was previously overhauled by Riley & Son, and once the loco has been fully stripped down, it will be possible to estimate how long the overhaul will take.

8572’s boiler is being overhauled by the ‘s engineering team. The boiler is being prepared for NDT testing by a specialist contractor.

If you would like to donate towards 8572’s appeal, you can do so via https://www.mandgn.org/steaming-into-the-next-century

Responses

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles