The GWR County Project team have been busy since the New Year in buildingĀ 1014 “County of Glamorgan”.
Connecting Rod and Safety Valves
Measurements have been taken in order to finalise the design for the connecting rods. This has included measuring the distance betweenĀ the centre line of the cylinder and crankpin.
A number of years ago, a safety valve bonnet was donated to the Great Western Society.
It has recently been found by the team working on the new build Saint and has been given a repaint.
Smokebox and Smokebox Saddle
Good progress has been made in the construction of the new smokebox and smokebox saddle.
The main barrel has been completed, along with the door ring which has been machined. As can be seen from the picture, the smokebox saddle fabrication is almost complete.
Where Next?
News Homepage
Ā Ā Ā For the Latest Railway News
RailAdvent Online Shop
Ā Ā Ā Framed Prints, DVD’s / Blu-Ray’s and more
LocoStop Community
Ā Ā Ā Come and share your railway pictures
The GWR County Project
Ā Ā Ā Visit their website
Responses
That safety valve cover looks a bit battered; no doubt itāll be tidied up before being put on the loco!
whot about the sAINT
Check the DRC Website For Details.
Release date set for early April for 2999 Lady of Legend.