As stated in last week’s Project Information, this week we are looking at BR Standard New Build project, The ‘Clan’ Project. First, we will explore the background of the Standard Class 6. Then move onto the aims and progress made by The ‘Clan’ Project.
Background
There was a high demand for a locomotive, to the design of the Standard 6, all over the newly-formed British Railways. Areas in Scotland, in particular lines like the Dumfries to Stranraer and The Somerset and Dorset in England. These were both known for their steep and twisting routes.
The main design work was carried out at Derby works, although each region’s works helped in the design process. The drawings of the Standard Class 7 Pacifics provided the starting point, but many components were reduced to gain a high route availability. To achieve this, a smaller boiler (pressed at 225 lbs/sq in) and cylinders (19.5 in diameter by 28 in stroke) were mounted on the Class 7 chassis. This only had only small changes. The 4-6-2 wheel arrangement was a must, as this allowed the fitting of a wide firebox, which was more suitable for burning poor quality coal. All these measures meant axle loading came in at 19 tons, equivalent to engines of Power Class 5 in the Scottish area.
All 10 locomotives were built at Crewe, the first, No. 72000 “Clan Buchanan”, being turned out in December 1951. As the first batch was only for 10 locos, it was completed less than a year later, with 72009 “Clan Stewart” in September 1952.
Performance of the Standard 6s
Performance of the ‘Clan’ class wasn’t the best initially. This is mainly due to them being put straight to work, rather than being tested at the Rugby test plant. Which meant teething problems were ironed out when footplate crews reported feedback. For instance, steaming was known to be difficult on the class. After blastpipe modifications and some smaller changes, steaming was soon improved.
Despite these minor problems, the Standard 6 was an impressive locomotive in the right hands, being economical on both water and coal and good steamers. Crews who were inexperienced with the class general disliked them, and it would take longer with the ‘Clans’ for crews to get used to them, as there was only 10 of them.
Initially, the order for the Standard 6s was for 25 locomotives. Although, due to a Steel Shortage and the Modernisation Plan looming, construction was discontinued on the next class members, with their frames being broken up. The Modernisation Plan would also set in stone the fate of the class, with first withdrawals in 1962. By the end of September 1966, the last member of the class, No. 72006 “Clan MacKenzie” was cut up.
The Project
The Standard Steam Locomotive Company Ltd’s (Parent body of The ‘Clan’ Project) aim is to build the 11th member of the Standard Class 6. Following on from where BR left off. This will include modifications suggested for the class but not fitted (all of the modifications are shown on Lot 242 drawing) and modifications required for mainline running in the 21st Century.
Progress
As of early December 2017, the project has made good progress. Many parts have been constructed, such as Smokebox, Cab, Frame (Being assembled with Horn guiders welded on) and Smokebox saddle (with exhaust system fitted) to name a few. These parts are spread across a few sites. Work has begun on assembling the Frame Plates at CTL Seal. Assembly of the parts onto the frame will take place when project find an appropriate base.
In recent news, an order for 4 Bogie Wheel Centres has been placed. These will require machining and tires, but these will be completed in due course. On arrival, they will be stored along with the Frame Plates for the Bogie, until they are assembled. Work on building the bogie and trailing truck should begin shortly. Producing Patterns for the Cylinders will also begin shortly.
If you would like to get involved or would like further information, please visit The ‘Clan’ Project’s website hereÂ
I hope you enjoyed this week’s Project Information. Look out for next Friday’s article. This which will be on a Southern Railway (or Locomotive of a design from a pre-grouping company) new build project.
- Visit the Clan Project Website
For more information
Responses
It is now 2019, December. The frames are in the process of erection. All parts are now stored securely at CTL Sheffield where excellent work is being carried out. Front bogie is in progress towards making the frames a rolling chassis. Please refer to the ‘Clan Project’ website for updates.
Hi John – this Project Information was made a fair while back, other updates have been made since this article was made 🙂
See other updates here: https://www.railadvent.co.uk/tag/the-clan-project
Hope this helps 🙂
Regards
Michael
Yes, thanks Michael. Latest News Magazine indicates much increased funding and manufacturing progress lately.
I like your website.
John
All good news, John. Perhaps see this loco in steam soon!
Thank you for your kind comments
Regards
Michael
[…] We recently did a ‘Project Information’ article on the Clan project, where we look into the history of the class, history of the project and also the progress of the build. If you would like to read the Project Information before you read this update, please click here […]
[…] In Mid-December late year, we published our Project Information on 72010 “Hengist”. The article featured the Background to the BR Standard 6s, Aim of The ‘Clan’ and the Progress they had made (Correct at time of writing). If you would like to read the article please click here […]